Recent Public Posts - [guest]
| A37 closed after bus wedged in garden hedge after veering off road - 15 Nov 2026 In "Buses and other ways to travel" [382000/32732/5] Posted by Chris from Nailsea at 23:09, 16th November 2026 | ![]() |
From the BBC:
Bus wedged in garden hedge after veering off road

The crash happened at about 12:00 GMT on Sunday
A bus remains wedged in someone's garden a day after it veered off the road.
The bus crashed into a driveway of a house on the A37, in Chilthorne Domer in Somerset, at about 12:00 GMT on Sunday. Police confirmed nobody was injured in the single-vehicle collision.
A spokesperson for First Bus said the company was working with emergency services to remove the number 376 bus from the garden.
The garden and driveway of the property were damaged in the crash and Avon and Somerset Police said a nearby telecommunications pole was also being assessed. It added that the road would remain closed while the scene was assessed for safety reasons.

The crash happened in Chilthorne Domer, near Yeovil
First Bus said it was investigating the circumstances which led up to the crash and did not yet know why the bus left the carriageway. "The safety of our customers, communities and staff is always our top priority," it added.

The crash happened at about 12:00 GMT on Sunday
A bus remains wedged in someone's garden a day after it veered off the road.
The bus crashed into a driveway of a house on the A37, in Chilthorne Domer in Somerset, at about 12:00 GMT on Sunday. Police confirmed nobody was injured in the single-vehicle collision.
A spokesperson for First Bus said the company was working with emergency services to remove the number 376 bus from the garden.
The garden and driveway of the property were damaged in the crash and Avon and Somerset Police said a nearby telecommunications pole was also being assessed. It added that the road would remain closed while the scene was assessed for safety reasons.

The crash happened in Chilthorne Domer, near Yeovil
First Bus said it was investigating the circumstances which led up to the crash and did not yet know why the bus left the carriageway. "The safety of our customers, communities and staff is always our top priority," it added.
| East Yorkshire rail services restored after leaves disruption - In "The Wider Picture in the United Kingdom" [381999/32731/51] Posted by Chris from Nailsea at 22:34, 16th November 2026 | ![]() |
From the BBC:
Rail services restored after leaves disruption

Northern services have been missing out some stops in East Yorkshire - Image © BBC/Daisy Reinsch
Rail services in East Yorkshire have returned to normal after some trains did not stop at stations due to "slippery" leaves on the tracks.
The cancelled stops by Northern were criticised by local MPs, who wrote to the company asking what was being done to deal with the problem. Hull North and Cottingham MP Dame Diana Johnson had said the annual autumn fall of leaves was "clearly not a new problem for the rail industry".
In response, Northern apologised for the disruption and said more than £17m was spent in the region each year by Network Rail on "vegetation management". It added: "Unfortunately, despite these efforts we can't yet completely eradicate the issue."
During the disruption, services between Scarborough and Hull did not call at Driffield, Beverley or Cottingham, but trains on the Hull to Bridlington route did stop at the three stations.
Sam MacDougall, from Northern, said the timetable had to be altered "so we could safely run services without causing significant disruption to the wider rail network".
He added: "We would like to apologise to the passengers who have been affected by the disruption in recent weeks. This autumn has been challenging as a large amount of leaves, which fell during two storms, made the tracks very slippery and interfered with the signalling system. This meant that some services were running at slower speeds and being held at red signals for longer, to ensure they kept a safe distance from other trains."

Northern services have been missing out some stops in East Yorkshire - Image © BBC/Daisy Reinsch
Rail services in East Yorkshire have returned to normal after some trains did not stop at stations due to "slippery" leaves on the tracks.
The cancelled stops by Northern were criticised by local MPs, who wrote to the company asking what was being done to deal with the problem. Hull North and Cottingham MP Dame Diana Johnson had said the annual autumn fall of leaves was "clearly not a new problem for the rail industry".
In response, Northern apologised for the disruption and said more than £17m was spent in the region each year by Network Rail on "vegetation management". It added: "Unfortunately, despite these efforts we can't yet completely eradicate the issue."
During the disruption, services between Scarborough and Hull did not call at Driffield, Beverley or Cottingham, but trains on the Hull to Bridlington route did stop at the three stations.
Sam MacDougall, from Northern, said the timetable had to be altered "so we could safely run services without causing significant disruption to the wider rail network".
He added: "We would like to apologise to the passengers who have been affected by the disruption in recent weeks. This autumn has been challenging as a large amount of leaves, which fell during two storms, made the tracks very slippery and interfered with the signalling system. This meant that some services were running at slower speeds and being held at red signals for longer, to ensure they kept a safe distance from other trains."
| Re: Manvers Street, Bath, disrupted for reconstruction works for 6 months from May. In "Buses and other ways to travel" [381998/31887/5] Posted by Mark A at 22:31, 16th November 2026 | ![]() |
Milsom Street photo from this afternoon.
Erm ... that picture is Manvers Street, not Milsom Street.

Oops, ta, corrected it with an edit.
Milsom Street photo from this afternoon.
Erm ... that picture is Manvers Street, not Milsom Street.

| Re: 25.11.2026 / WWRUG talk South Wales Metro and lessons for Bath and Wiltshire In "Bristol and Bath (WECA, now WEMCA)" [381996/32729/21] Posted by Noggin at 21:51, 16th November 2026 | ![]() |
Should be a good talk. I wonder if given the chance to do things differently, they would still opt for discontinuous electrification, or would spend the money on civil engineering instead?
| Nailsea & Backwell station - Road Replacement Bus, 14 November 2026 In "Bristol and Bath (WECA, now WEMCA)" [381995/32730/21] Posted by Chris from Nailsea at 21:42, 16th November 2026 | ![]() |
I have been contacted, in a PM, by one of our respected bus driver members of the this Coffee Shop forum, with some information to form the basis of this topic.
From the bus driver, posting on flickr, he wrote:
My first ever visit to Yatton, I was standby and sent to cover a missing vehicle that had been sent home for lack of Audio announcements. Being a decker I couldn’t access Nailsea and Backwell and served Backwell crossroads instead.
From additional information in his PM to me, I can say that I was not affected personally by this incident:
Hopefully you, or your fellow Nailsea residents weren’t waiting for the 11:26 rail replacement bus to Bristol on Saturday.
Another operator was sent home for not having next stop announcements on their single decker, I was the standby but I had a double decker so couldn’t get up to the station! I dropped a few off at Backwell crossroads as a compromise!
Maybe a topic is waiting for this….
Another operator was sent home for not having next stop announcements on their single decker, I was the standby but I had a double decker so couldn’t get up to the station! I dropped a few off at Backwell crossroads as a compromise!
Maybe a topic is waiting for this….
I am happy to start this topic. I also commend this bus driver for not attempting to drive a double decker under the railway bridge at Nailsea & Backwell: it clearly won't fit - but other bus drivers have attempted it, in the past.
CfN.

| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381994/32728/44] Posted by Richard Fairhurst at 21:12, 16th November 2026 | ![]() |
Chiltern have been pretty hopeless the last five or so years. All these extra trains are doing is partly restoring the timetable that operated before Covid.
...just slower! Oxford Parkway to Marylebone was 58 minutes when it opened. It's now usually ~80 minutes, or 68 on a couple of remaining fast-ish trains. I understand the argument that now Oxford (Central) has a half-hourly IET then Chiltern doesn't need to duplicate the fast trains, but it does seem to weaken the case for having built Parkway.
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381993/31911/12] Posted by Mark A at 20:50, 16th November 2026 | ![]() |
Ah, it arrived at Exeter Central from the east.
https://www.realtimetrains.co.uk/service/gb-nr:W34771/2026-11-12/detailed#allox_id=0
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381992/31911/12] Posted by eXPassenger at 20:44, 16th November 2026 | ![]() |
No need to run round at Exeter to go from Central to Taunton
They would need to run round at Central to get it back to Taunton.
| Re: Swindon <-> Westbury service updates and amendments, ongoing discussion - 2026 In "TransWilts line - Swindon, Chippenham, Westbury" [381991/31359/18] Posted by grahame at 19:55, 16th November 2026 | ![]() |
17:50 Gloucester to Salisbury due 20:06
17:50 Gloucester to Salisbury due 20:06 will be terminated at Warminster.
It will no longer call at Salisbury.
It has been previously delayed and is now 29 minutes late from Chippenham.
This is due to passengers causing a disturbance on this train.
17:50 Gloucester to Salisbury due 20:06 will be terminated at Warminster.
It will no longer call at Salisbury.
It has been previously delayed and is now 29 minutes late from Chippenham.
This is due to passengers causing a disturbance on this train.
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381990/32728/44] Posted by LiskeardRich at 19:33, 16th November 2026 Already liked by Chris from Nailsea | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Not if/when GBR/DfT remove the 15-29 minute refund band!
They were a bit prompt this weekend. Delay repay approved within 24 hours of submitting! Last one took 29 days.
| Re: Railway bridges struck by road vehicles - many incidents, ongoing discussion In "The Wider Picture in the United Kingdom" [381989/8910/51] Posted by Clan Line at 19:04, 16th November 2026 | ![]() |
This link: https://www.bbc.co.uk/news/articles/cm868wp5852wo includes this:

The railway doesn't cross Warminster Road in Westbury - presume it should refer to Wilton ?
| Re: Manvers Street, Bath, disrupted for reconstruction works for 6 months from May. In "Buses and other ways to travel" [381988/31887/5] Posted by Mark A at 17:46, 16th November 2026 | ![]() |
An update: the works to Manvers Street look to be on course to complete on time for the predicted reopening date. The top surface of tarmac went down last night. Pleasingly, the entire length of the pavements alongside have been put in to good order as well, and the crossings of the entrances to what was the police station have been tamed. That'll at least allow the Faresaver buses to run to the bus station, and perhaps we'll have some progress on the stopping patterns.
Given that there may be a series of additional closures in the offing the entire 'Access across the city' aspect of this really needs addressing, but with the Guildhall - Manvers Street access being the only practicable option for buses approaching from the London Road, for public transport, I can't come up with any suggestion more sensible than what the French would call a 'Petite Train' operation via New Bond Street / Union Street / Stall Street / Southgate. Shame the river can't be used: the Avon has no manners though.
Manvers Street photo from this afternoon.

| Re: Class 175s to Great Western Railway (GWR) In "Across the West" [381987/28982/26] Posted by a-driver at 16:26, 16th November 2026 | ![]() |
There’s 5 or 6 available for passenger service, a further 5 will probably clear their fault free running period this week.
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381986/32728/44] Posted by TaplowGreen at 16:20, 16th November 2026 | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Not if/when GBR/DfT remove the 15-29 minute refund band!
.......would that constitute a "radical change"?
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381985/32728/44] Posted by IndustryInsider at 15:41, 16th November 2026 | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Not if/when GBR/DfT remove the 15-29 minute refund band!
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381984/32728/44] Posted by LiskeardRich at 13:43, 16th November 2026 | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Cancellations to services at Exeter St Davids
Following urgent repairs to the track earlier today at Exeter St Davids all lines will be reopened shortly.
Train services running through this station may be cancelled or delayed. Disruption is expected until 10:00 15/11.
1A77 0830 Exeter St Davids to London Paddington left Exeter at 0931.
1A78 0827 Plymouth to London Paddington running 12 late approaching Starcross.
Following urgent repairs to the track earlier today at Exeter St Davids all lines will be reopened shortly.
Train services running through this station may be cancelled or delayed. Disruption is expected until 10:00 15/11.
1A77 0830 Exeter St Davids to London Paddington left Exeter at 0931.
1A78 0827 Plymouth to London Paddington running 12 late approaching Starcross.
I was on rail replacement Bristol Temple Meads to Weston Super Mare yesterday. We didn’t have a train arrive from the west until 1100, and thus no departure back until 1122 I think it was. We were bringing in bus loads to find no onward train.
The station manager did an excellent job arranging taxis and I’ve never seen so many taxis turning up at once!
Chiltern have been pretty hopeless the last five or so years. All these extra trains are doing is partly restoring the timetable that operated before Covid. Something GWR did years ago.
And, yes, don’t mention EWR!
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381981/32728/44] Posted by Ralph Ayres at 11:07, 16th November 2026 Already liked by IndustryInsider, Mark A | ![]() |
"This is our first timetable change as a publicly owned railway", say Chiltern. Demonstrably true, but irrelevant as the changes would have been in the pipeline well before coming back into public ownership. They (or rather the DfT) want us to make a connection but much like SWR's "new" rolling stock, they are not the result of the switch. If only improvements really could be delivered that quickly!
(and shush, don't mention East West Rail!)
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381980/31911/12] Posted by rogerw at 11:00, 16th November 2026 | ![]() |
No need to run round at Exeter to go from Central to Taunton
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381979/31911/12] Posted by Witham Bobby at 10:37, 16th November 2026 | ![]() |
[SNIP]
Thanks to the broken rail at Exeter St David's, the Sleeper spent an hour or so at Exeter Central, then was sent up to Taunton (presumably because of lack of space at St David's) and stabled there for a short while before reversing and continuing its journey down to Penzance some 5 hours down.
A sensible bit of railway work. Was there already a loco on the rear of the service as it arrived at Exeter? Or did they find a way to run the train engine round onto what was the back end of the train? And again at Taunton? Such a rarity, these days, with passenger trains
Ahh the memories of a WSR team led by Harry Lee having the run of Pwhelli station in 1975 to dismantle and remove the parachute style water tower from the end of the island platform and from the closed loco shed area. No British Rail staff present - just allowed to get on with it on a Sunday when no trains were running. The relationship we had with everywhere on BR, except, sadly, the Bristol Division of the WR
Good luck to the NLR in their extraction of this relic. It's amazing that it has survived
One of the Pwhelli towers lives on at Minehead. I can't say what's happened to others
Mark Hopwood's GWR team have done a good job there, then.


I think I would go for fair or ok, rather than higher status of good.
More plodding along, middling rather being up with best operators.
And never managed to get a business case that meant Project Churchward and replacing aging DMUs was only economic sensible scenario, rather than do nothing for time being option.
A "C" at very best.
Latterly in thrall to the DfT but plenty of missed opportunities in earlier years when GWR had more control - cans kicked down the road or issues left on the "too difficult" pile.
I would have liked to have seen a more visibly robust challenge by Hopwood to Network Rail over the continued and deteriorating state of the infrastructure on the LTV corridor and its impact on his services and customers - even Mayor Sir Lord Khan chipped in on that one - but I guess the MD and others had their eyes on a future sinecure as part of a nationalised organisation and didn't wish to rock the boat.........and that seems to have come to pass.
Can't help thinking it may be time for a new hand on the tiller and a fresh approach however whilst generously rewarded by the taxpayer, those hands may be secured with cuffs under the dead hand of Government..........looking at Burnham's priorities it will probably be crumbs from the table going forward for rail.
| Re: ORR station usage data In "Across the West" [381976/31203/26] Posted by grahame at 08:37, 16th November 2026 | ![]() |
Heads Up, ORR is showing 19th November (so about 2 weeks earlier than last year) for latest annual station usage figures.
ORR data is normally published about 09:30 to 10am on Thursdays
ORR data is normally published about 09:30 to 10am on Thursdays
That "figures" in that it has been in the publication calendar for November for quite a long time, but without a definite date.
| Re: GWR reassures passengers: No radical change after nationalisation on 13 Dec 2026 In "Across the West" [381975/32716/26] Posted by John D at 08:28, 16th November 2026 | ![]() |
Mark Hopwood's GWR team have done a good job there, then.


I think I would go for fair or ok, rather than higher status of good.
More plodding along, middling rather being up with best operators.
And never managed to get a business case that meant Project Churchward and replacing aging DMUs was only economic sensible scenario, rather than do nothing for time being option.
| Re: ORR station usage data In "Across the West" [381974/31203/26] Posted by John D at 08:19, 16th November 2026 Already liked by grahame, Mark A | ![]() |
Heads Up, ORR is showing 19th November (so about 2 weeks earlier than last year) for latest annual station usage figures.
ORR data is normally published about 09:30 to 10am on Thursdays
| 25.11.2026 / WWRUG talk South Wales Metro and lessons for Bath and Wiltshire In "Bristol and Bath (WECA, now WEMCA)" [381973/32729/21] Posted by grahame at 06:42, 16th November 2026 | ![]() |
Our speaker at the West Wiltshire Rail User Group on Wednesday 25th November 2026 will be Nathan Sealy, Head of Practice, Systems Engineering and Digital at Amey Consulting Rail, who are key players in the South Wales Metro project. Nathan will talk about the project, of which many elements are now coming online. He will tell us about success and challenges, and comment as to how the various elements learned shape our own move towards a Bath and Wiltshire Metro which is in a much earlier phase.
"The South Wales Metro is making significant improvements across the rail network there to provide the people of South Wales with a more reliable, faster, greener and more accessible transport system. Transport for Wales are investing in the Metro project to create better access to jobs, healthcare, and education. This integrated network of rail, bus, and walking and cycling routes will improve connectivity, making it easier to get where you need to go without any hassle." say Transport for Wales
"The Bath & Wiltshire Metro (also referred to as MetroWest Bath & Wiltshire) is a proposed regional rail upgrade project designed to turn existing railway lines into a frequent, turn-up-and-go mass transit network. Led by the campaign group ConnectedCities, Transport for New Homes, and engineering firm Amey, the scheme aims to serve over 350,000 to 400,000 residents across Bath, western Wiltshire, and parts of Somerset" says the Foundation for Integrated Transport.
The meeting starts at 19:30 (coffee and networking from 19:00) at the Bethesda Church Hall in Trowbridge (Gloucester Road, Trowbridge, Wiltshire, BA14 0AA - 100 yards from the station across Trinity Church Square. For paid up members, the evening is included in your £8 (£10 family) annual fee. Guests are not only welcome but encouraged to come along, and we ask for £2 towards our costs as an independent passenger group. Some car parking is available, and the meeting is wheelchair accessible. The meeting is timed to conclude just after 21:00 so that attendees can catch trains back to their home towns in West Wiltshire (Bradford-on-Avon, Melksham, Warminster and Westbury) and across the wider region (Bath, Bristol, Chippenham, Frome, Salisbury, Swindon, etc). Please message the poster of this notice if you have any questions. We look forward to seeing you on the evening for a positive look forward for public transport to, from and within Bath and West Wiltshire.





| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381972/32728/44] Posted by TaplowGreen at 04:47, 16th November 2026 Already liked by Witham Bobby | ![]() |
Probably wise from GWR given the rolling stock issues.
Indeed. It feels like the perennial issue problem of the GWR franchise going back 20+ years has been stock availability, which has been almost entirely down to the DfT.
Yes, GWR area rolling stock has been the big privatisation problem. There had been big investments in 1976-1982 with HSTs, some investment on the regional Wessex and South West in late 1980s with the pacers, 155s, 158s etc. Then Network South East introduced the 165 suburban and 166 outer suburban DMUs.
Then it sort of went completely wrong and nothing really happened for 23 years from about 1993 to 2016. At best was really some repainting and patching up.
Then the electrification (later truncated) seem to lead to more of a bodge and hiatus. The IETs, which needed late fuel tank size and engine up-spec, 387s getting moved to Heathrow Express, Elizabeth line taking over local services, displacing trains, Thames Valley branches and Gatwick line staying diesel so needing the trains that should have moved west. A fleet of aging DMUs replacing the pacers. Bristol based regional routes getting stuck with class 165s still in inner suburban configuration
And at the time of nationalisation late 2026, nothing on order. Even though the sleeper fleet is 40+ years old, the class 150s are 39-40 years old, the 158, 165, 166 (and SWR 159s) are 34-37 years old. No apparent forward plan (beyond unfunded ideas).
So as it tends to take 4-7 years to introduce any new trains, what is plan 2026-2032. Basically seems to be unreliable 175s (which are 25 years old), and some ex Wales 158s (already 36 years old), no positivity, just a bodge until 2030s with others hand-me-downs
I think you can be reassured, if it's any consolation, that there is no need to worry about radical change

| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381971/32728/44] Posted by John D at 04:11, 16th November 2026 Already liked by Witham Bobby | ![]() |
Probably wise from GWR given the rolling stock issues.
Indeed. It feels like the perennial issue problem of the GWR franchise going back 20+ years has been stock availability, which has been almost entirely down to the DfT.
Yes, GWR area rolling stock has been the big privatisation problem. There had been big investments in 1976-1982 with HSTs, some investment on the regional Wessex and South West in late 1980s with the pacers, 155s, 158s etc. Then Network South East introduced the 165 suburban and 166 outer suburban DMUs.
Then it sort of went completely wrong and nothing really happened for 23 years from about 1993 to 2016. At best was really some repainting and patching up.
Then the electrification (later truncated) seem to lead to more of a bodge and hiatus. The IETs, which needed late fuel tank size and engine up-spec, 387s getting moved to Heathrow Express, Elizabeth line taking over local services, displacing trains, Thames Valley branches and Gatwick line staying diesel so needing the trains that should have moved west. A fleet of aging DMUs replacing the pacers. Bristol based regional routes getting stuck with class 165s still in inner suburban configuration
And at the time of nationalisation late 2026, nothing on order. Even though the sleeper fleet is 40+ years old, the class 150s are 39-40 years old, the 158, 165, 166 (and SWR 159s) are 34-37 years old. No apparent forward plan (beyond unfunded ideas).
So as it tends to take 4-7 years to introduce any new trains, what is plan 2026-2032. Basically seems to be unreliable 175s (which are 25 years old), and some ex Wales 158s (already 36 years old), no positivity, just a bodge until 2030s with others hand-me-downs